ORDER LL-0412 · PLACED 9 SEP 2026 · FOR LISBON

Two Tegalsari chairs

Smoked teak, sand linen, matte oil.
NowJoinery & construction
Expected readyWeek of 2 Nov
TODAY · 30 SEP
WK 01WK 02WK 03WK 04WK 05WK 06WK 07WK 08
CONCEPT DEMO — VIEW THE PAGE AT STAGE
  1. 01
    WEEK 01Order confirmedDone 12 Sep
    “Deposit received. Your job number is LL-0412: two chairs, smoked teak, sand linen, matte oil.”— Workshop
  2. 02
    WEEK 01Material selectedDone 16 Sep · M.
    “We took the back legs for both chairs from the same board so the grain matches across the pair.”— Made
    Sawn boards stacked on a rack, ends staggered.
  3. 03
    WEEK 02Timber preparationDone 23 Sep · M.
    “Your timber has been selected and is being prepared for joinery. Rough-cut, then left three days to settle before planing.”— Made
    The edges of planed boards, stacked flat.
  4. YOUR CHAIRS ARE HERE
    04
    WEEK 03Joinery & constructionIn progress since 23 Sep
    “Your frame is being assembled this week.”— Made
    A workpiece held down on a bench with two clamps.
  5. 05
    WEEK 05Sanding & finishingFrom about 7 Oct
    What happens next: Five days in the smoking tent, then three coats of oil with a day between each.
  6. 06
    WEEK 07Final inspectionFrom about 24 Oct
    We check every joint, level the chairs on the flat bench, and look at the finish under raking light. Then we sign the underside.
  7. 07
    WEEK 08Ready for deliveryFrom about 31 Oct
    Crated for Lisbon. The freight forwarder collects from the workshop.

Questions about your order go to the workshop directly: WhatsApp +62 000 0000 000, or reply to any update email. You will hear from a maker, not a ticket system.